AdeMoore
Western Thunderer
Didn’t know where to put this saw another 200 entry here so decided that’ll do!
After advice really as I’m thinking what I’ve done so far doesn’t work so after any ideas!
Below I have 2 main line tracks one is the modular one where if your lucky and get to the final all 200 modules will be joined together.
I wanted a higher level N.G. Line which I think does work, but immediately on entry from an accommodation bridge the line heads over an Occupation Bridge. Felt ok and the down mainline had a siding running generally to a wall between the N.G. Embankment and the double line accommodation bridge. Now having built it, (I don’t really do plans it just kinda gets built as I go!) the double bridge seems awkward to fit in. Just a template to see how it’s looking.

Seems no logical way to tie in the two bridges at this close together? Unless someone can see something I can’t!


So with the above having been poorly thought out I’m thinking move the occupational bridge like halfway down the board then the embankment can run to the back of the hut and will look far better?

N.G. Halt will need shuffling to the end of the board. or or! Put occupational bridge right up this end!
Cheers for anyone looking in and caring to comment.
After advice really as I’m thinking what I’ve done so far doesn’t work so after any ideas!
Below I have 2 main line tracks one is the modular one where if your lucky and get to the final all 200 modules will be joined together.
I wanted a higher level N.G. Line which I think does work, but immediately on entry from an accommodation bridge the line heads over an Occupation Bridge. Felt ok and the down mainline had a siding running generally to a wall between the N.G. Embankment and the double line accommodation bridge. Now having built it, (I don’t really do plans it just kinda gets built as I go!) the double bridge seems awkward to fit in. Just a template to see how it’s looking.

Seems no logical way to tie in the two bridges at this close together? Unless someone can see something I can’t!


So with the above having been poorly thought out I’m thinking move the occupational bridge like halfway down the board then the embankment can run to the back of the hut and will look far better?

N.G. Halt will need shuffling to the end of the board. or or! Put occupational bridge right up this end!
Cheers for anyone looking in and caring to comment.
Last edited:
































































